Shop Overhead Cranes Playbook: Runway Alignment and Load TestingIn Detail

In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This long-form walkthrough shows how a full overhead crane system comes to life inside a structural building. You’ll see structural checks, safety, and QA/QC—all explained in clear, real-world language.

What an Overhead/Bridge Crane Is

At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: and lift via the hoist.

You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.

Why they matter:

Controlled moves for large, expensive equipment.

Less manual handling, fewer delays.

Lower risk during rigging, lifting, and transport inside facilities.

High throughput with fewer ground obstructions.

Scope at a Glance

Runways & rails: runway girders with crane rail and clips.

End trucks: wheel assemblies that ride the rail.

Bridge girder(s): single- or double-girder configuration.

Trolley & hoist: cross-travel carriage with lifting unit.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: overload protection, e-stops.

Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.

Make-Ready & Surveys

Good installs start on paper. Key steps:

Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.

Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.

Runway verification: Survey columns and runway beams for straightness, elevation, and span.

Power readiness: Lockout/tagout plan for energization.

Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.

People & roles: Brief everyone on radio calls and stop-work authority.

Millimeters at the runway become centimeters at full span. Spend time here.

Getting the Path Right

Runway alignment is the foundation. Targets and checks:

Straightness & elevation: shim packs under clips to meet tolerance.

Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.

End stops & buffers: Verify clearances for bumpers at both ends.

Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.

Log final numbers on the ITP sheet. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.

Putting the Span in the Air

Rigging plan: Choose spreader bars to keep slings clear of electricals. Taglines for swing control.

Sequence:

Install end trucks at staging height to simplify bridge pick.

For double-girder cranes, lift both girders with a matched raise.

Use drift pins to align flange holes; torque to spec.

Verify camber and bridge square.

Prior to trolley install, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Re-apply LOTO once checks pass.

Hoist & Trolley

Trolley installation: Mount wheels, align wheel flanges, set side-clearances.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Check overload/SLI and emergency stop.

Cross-travel adjustment: Align trolley rails on a double-girder.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

A smooth trolley with a quiet hoist is a sign of good alignment. Fix the mechanics first.

Electrics & Controls

Power supply: Conductor bars with collectors or a festoon system.

Drive setup: Program VFDs for soft starts, decel ramps, and brake timing.

Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.

Cable management: Secure junction boxes; label everything for maintenance.

Future you will too. If it isn’t documented, it didn’t happen—put it in the databook.

Trust but Verify

Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.

Torque logs: Record wrench serials and values.

Level & gauge reports: Note any corrective shims.

Motor rotation & phasing: Document bump tests.

Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.

QA/QC is not paperwork—it’s your warranty in a binder.

Ready for Work

Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.

Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Maintenance intervals for rope, brakes, and gearboxes.

Only after these pass do you hand over the keys.

Where These Cranes Shine

Construction & steel erection: placing beams, trusses, and precast.

Oil & gas & power: generator and turbine assembly.

Steel mills & foundries: large part transfer.

Warehousing & logistics: bulk material moves with minimal floor traffic.

Once teams learn the motions, cycle times drop and safety improves.

Controls that Matter

Rigging discipline: timothy cook construction ltd rated slings & shackles, correct angles, spreader bars for load geometry.

Lockout/Tagout: test before touch every time.

Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.

Runway integrity: no cracked welds, correct bolt grades, proper grout.

Duty class selection: match crane class to cycles and loads.

A perfect lift is the one nobody notices because nothing went wrong.

Keep It Rolling

Crab angle/drift: re-check runway gauge and wheel alignment.

Hot gearboxes: misalignment or over-tight brakes.

Rope drum spooling: dress rope and reset lower limit.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: add rail sweeps and check clip torque.

Little noises are messages—listen early.

Fast Facts

Overhead vs. gantry? Choose per site constraints.

Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.

How long does install take? Anything from a couple weeks to a few months.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Who Gets the Most Value

If you’re a civil or mechanical engineer, construction manager, shop supervisor, or just a mega-project fan, this deep dive makes the whole process tangible. You’ll gain a checklist mindset that keeps cranes safe and productive.

Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?

Get the toolkit now and cut hours from setup while boosting safety and QA/QC. Bookmark this guide and share it with your crew.

...